Ledeberg
E3
Ledeberg
E3
Our latest project comes to life with impressive figures:
- 162 foundation piles ensure a solid base.
- 440 tons of steel structure provide maximum stability to the building.
- 2045 m² of prefab terraces offer ultimate living comfort.
- 3350 meters of railings guarantee both safety and style.
- 476 steps in the emergency staircase ensure functional accessibility.
Timeline
The construction will begin at the end of March 2024, with completion scheduled for the summer of 2025.
A company you can rely on
A construction company with 200 years of experience
Verstraete.team, a 5th generation, class 8 construction company with expertise in construction and carpentry